EuroFix partnerships and franchise network — authorized distributor, licensed manufacturing partner, and full factory franchise

Partnership questions, answered

What are the terms for becoming a EuroFix distributor?

The investment is published in three tiers: authorised distributor from $20,000 to $50,000, licensed manufacturing partner from $150,000 to $400,000, and a full factory franchise from $1,000,000 upwards. The commercial detail — pricing, volume commitments and territory boundaries — is agreed per territory, because duty, logistics and market size differ. Entry-level distribution is **not exclusive**: it starts as a protected territory that becomes exclusive on performance, and that is deliberate — coverage first, exclusivity for whoever earns it. Fixed for every partner: the full technical documentation (EN classifications, datasheets, batch certificates), EuroFix Academy training for his tilers, and engineering support that reaches the site.

What partnership levels are available?

Three. **Authorised distributor** ($20K–$50K): sells the branded product in his territory, with a protected — not exclusive — territory that becomes exclusive on performance. **Licensed manufacturing partner** ($150K–$400K): produces EuroFix formulations locally under the same quality control, with a formulation licence. **Full factory franchise** (from $1M): complete technology transfer and country-level market exclusivity — covering the plant, installation, commissioning and the brand, not equipment alone. The right level depends on market size and the partner's capacity.

How do I apply, and how long does a reply take?

Through the partnerships page or the contact page, stating your territory, your current business (warehouse, builders' merchant, contracting) and the market you serve. Applications are reviewed per territory, and the commercial discussion opens directly with those who qualify.

Are distributorships available in Syria and Iraq now?

Yes — the distribution network is being built now across the fourteen Syrian governorates and the Iraqi governorates, the phase that precedes the start of production at the Hama plant. Partners who enter at this stage build their territory before competition for it is settled.